The most significant investment of the past decades at Hungexpo has been completed. As a result, the covered area of more than 70,000 square meters and the open area of…
Grand Hotel Esztergom
In Esztergom, the nearly 7 billion Forint investment was built in Táncsics Street leading up to the Mária Valéria Bridge, on Prímás Island, which, after many years of delay, was…
RAVATHERM XPS on the JYSK facade
JYSK furniture store’s new logistics center in Ecser covers a total of 143,000 square meters, with an additional 115,000 square meters of external paved surface. RAVATHERM XPS thermal insulation was…
Mol tower
The Mol tower block under construction at the Kopaszi Dam has reached its peak. The handover of the country’s first skyscraper is due in 2022. The Mol tower under construction…
Buda’s biggest shopping center
The construction of a 300 million euro shopping center, Etele Plaza began in Budapest in 2018. The work was characterized by the fact that the formwork surface is 165 thousand…
OTP office building is ready
OTP Group operates at 27 different locations in Budapest, excluding the branch network, many of which will be moved to the new building. About three thousand employees work in the…
The solutions of the new MOME campus
The MOME building underwent a significant transformation. After the forced closures due to the virus situation, life is slowly moving back into the new complex, where MOME’s decades-long dream has…
Last VÁCI GREENS building handed over
Váci Greens office complex received its final form after nearly a decade of persistent work. With the completion of buildings E and F, the last elements of Váci Greens were…
Budapest Multifunctional Arena
The handover of the Budapest Multifunctional Arena is due in mid-December. This will be the main venue of the 2022 Hungarian-Slovakian Men’s Handball European Championship. The construction of the arena,…