• Skip to primary navigation
  • Skip to main content
  • Skip to footer
  • Magyarország
    • | RBS Group
    • | Austria
    • | Belgium
    • | Bulgaria
    • | Croatia
    • | Czech Republic
    • | France
    • | Germany
    • | Greece
    • | Hungary
    • | Italy
    • | Poland
    • | Serbia
    • | Slovakia
    • | Slovenia
    • | Spain
    • | Switzerland
    • | The Netherlands
    • | Turkey
    • | United Kingdom
  • en
    • Magyar (Hungarian)
    • English
RBS - HU
  • Applications
    FLAT ROOF
    • Inverted roof
    • Roof terrace
    • Greenroof
    • Parking roofs
    • Duo roof/plus roof
    • Thermal insulation of industrial flat roof
    FLOOR
    • Residential floor
    • Industrial floors
    • Cold storage floors
    WALL
    • Thermal bridges
    • Socle insulation
    • Inside wall insulation
    • Core insulation
    • External thermal insulation system
    PERIMETER / BASEMENT
    • Perimeter
    • Base-slab insulation
    • Basement insulation
    PITCHED ROOF
    • Pitched roofs thermal insulation above rafters
    • Pitched roofs thermal insulation below rafters
    • Reinforced concrete pitched roofs
    • Insulation of poultry sheds
    SPECIAL APPLICATIONS
    • Renovation
    • Sport surfaces
    • Unheated structures
    • Pipework systems
    • Lightweight fill
    • Roads, railway tracks
  • Products
    RAVATHERM XPS 250 PB RAVATHERM XPS 300 SL RAVATHERM XPS 300 ST RAVATHERM XPS 300 WB RAVATHERM XPS 500 SL RAVATHERM XPS 700 SL RAVATHERM SW Roof RAVATHERM SW ETICS Plus
  • Knowledge Base
  • Downloads
  • About Us
    • About Us
    • History of XPS
    • Image video
    • News
    • References
  • Contact
    • Contact
    • Find your dealer
Search
Results for {phrase} ({results_count} of {results_count_total})
Displaying {results_count} results of {results_count_total}

Próbáld ezt: XPS hőszigetelésKőzetgyapot hőszigetelésGyakori kérdések

  • Applications
  • Knowledge Base
  • Downloads
  • Products
    • RAVATHERM XPS 300 SL
    • RAVATHERM XPS 300 WB
    • RAVATHERM XPS 300 ST
    • RAVATHERM XPS 500 SL
    • RAVATHERM XPS 700 SL
  • About us
  • Contact
    • Find your dealer
    • Contact
huen
Choose country

Mol tower

Home / References / Mol tower
  • Building

    Mol Campus tower block
  • Architect

    Finta Studio, Foster + Partners
  • Year

    2022
  • Location

    Budapest
  • Constructor

    Market

The Mol tower block under construction at the Kopaszi Dam has reached its peak. The handover of the country’s first skyscraper is due in 2022.

The Mol tower under construction will be Hungary’s first skyscraper. At the end of summer, however, it already reached its final height, so the 143-meter high is already more than half ready. The building boasts not only watch numbers, but also principles of environmental awareness.

The plans for the campus were prepared by the internationally listed Foster + Partners of London and the Hungarian Finta Studio. The 28 floors of the 143-meter-high tower block have a total floor area of ​​86,000 square meters.

Mol laid the foundations of the building in October 2018, and its construction is currently approximately two-thirds complete. The reinforced concrete structure of the tower building is ready, and the installation of the steel structure of the crown and the installation of the element facade are in progress.

The Mol Campus will be one of Budapest’s most innovative and greenest office buildings, organically fitting into the skyline of the renewed Kopaszi Dam, and with its forward-looking, sustainable and smart solutions, it can become one of the capital’s iconic buildings. The office building will also represent the highest level in terms of energy saving, environmental awareness and sustainability in order to obtain the BREEAM Excellent and LEED Platinum grades.

The Mol Campus will be one of Budapest’s most innovative and greenest office buildings, organically fitting into the skyline of the renewed Kopaszi Dam, and with its forward-looking, sustainable and smart solutions, it can become one of the capital’s iconic buildings. The office building will also represent the highest level in terms of energy saving, environmental awareness and sustainability in order to obtain the BREEAM Excellent and LEED Platinum grades.

38 percent of its heating energy is provided by geothermal heat energy through ground probes, 5 percent also uses solar energy and utilizes rainwater. The goal is to achieve the highest possible employee comfort with the smallest ecological footprint, thus demonstrating Mol’s commitment to green values.

The construction time was significantly reduced by the fact that the 2 stiffener cores serving as the structural backbone of the tower were built with an automatic creep formwork system by Market’s subsidiary, Moratus Szerkezetepító Kft. The construction of the 200-ton system was preceded by several months of planning and installation work.

Also in Hungary, the contractor built a 120-meter-high passenger and freight elevator in a unique way, thereby helping the structural and facade construction works. To clean the facade, the plans include the construction of an almost 80-ton crane structure at the very top of the tower. Due to the work being carried out at height, a unique technology in Hungarian high-rise construction, an automatic wind shield system, had to be used.

New OTP office building on the way

New OTP office building on the way

OTP Bank’s new office building, one of Budapest’s most important office developments, was completed in 2020. The building, which is almost completely ready, will be able to accommodate approximately 3,000…
Read More
Did you know? RAVATHERM XPS also in the gym in Veszprém!

Did you know? RAVATHERM XPS also in the gym in Veszprém!

As part of the Modern Cities Program, Veszprém recently gained a new gymnast as part of the renovation of the City Stadium complex. In addition to serving local needs, the…
Read More
RAVATHERM XPS in the new Richter headquarters

RAVATHERM XPS in the new Richter headquarters

Richter Gedeon Ltd. is enriched with a new headquarters. The building will be constructed in the area next to the Chemical Research and Office Building (KKI), handed over in 2007,…
Read More

Application fields

Inverted roof
Residential floor

Footer Newsletter

Do you want to be informed about our latest news?

E-mail address fault

NEWSLETTER (EN)

  • This field is for validation purposes and should be left unchanged.
  • Confirm Humanity - Before we subscribe you, we need to confirm you are a human.

About Us

  • Ravago Building Solutions
  • About Us
    • Image video
    • News
    • References

Products

  • RAVATHERM XPS 300 WB
  • RAVATHERM XPS 300 SL
  • RAVATHERM XPS 300 ST
  • RAVATHERM XPS 500 SL
  • RAVATHERM XPS 700 SL

Applications

  • Applications

Knowledge Base

  • Knowledge Base

Downloads

  • Downloads

Contacts

  • Find your dealer
  • Find your dealer

Ravago Building Solutions
Hungary Kft.

8184 Balatonfűzfő, Almádi út 4.
[+36 88] 59 6979
info@ravatherm.com

Member of

Ravago

Kövess minket

™ Trademark of Ravago S.A.
  • Privacy Policy
  • Cookie Policy
  • Terms of Use
Results for {phrase} ({results_count} of {results_count_total})
Displaying {results_count} results of {results_count_total}

Próbáld ezt: XPS hőszigetelésKőzetgyapot hőszigetelésGyakori kérdések